Included for natural minerals like sand, rubble, and metal.
: Breaking down the cost of materials, labor, and machinery for specific tasks.
Specific schedules for bituminous (asphalt) work, earthwork for embankments, and structural steel for bridges.
Focus on structure, analysis of rates, lead/lift, and index application – not memorizing 2015 rates.
| Sr. No. | Description of Item | Unit | Rate (₹) | |---------|--------------------|------|-----------| | 1 | Earthwork in excavation in ordinary soil (all leads & lifts up to 50m) | cum | 135.00 | | 2 | Earthwork in hard murrum / soft rock | cum | 210.00 | | 3 | Filling available excavated earth (compacted) | cum | 85.00 | | 4 | Providing and laying cement concrete 1:4:8 (40 mm aggregate) | cum | 2,850 | | 5 | RCC 1:2:4 (20 mm aggregate) – excluding steel | cum | 4,200 | | 6 | Reinforcement steel (Fe 500) – cutting, bending, placing | MT | 48,000 | | 7 | Brick masonry in CM 1:6 (class 7.5 bricks) | cum | 3,200 | | 8 | 12 mm cement plaster 1:6 | sqm | 75.00 | | 9 | Whitewashing / color washing (two coats) | sqm | 18.00 | | 10 | Painting – enamel paint (two coats over primer) | sqm | 65.00 | | 11 | Flooring – ceramic tiles 300x300 mm (including 20 mm thick mortar) | sqm | 310.00 |
The document is not a monolithic slab rate. It is divided into of Maharashtra (including now-separated districts like Palghar, which was part of Thane in 2015). For each district, the rates vary based on:
Understanding the PWD Maharashtra District Schedule of Rates (DSR) 2015-16
Included for natural minerals like sand, rubble, and metal.
: Breaking down the cost of materials, labor, and machinery for specific tasks. Pwd Dsr 2015-16 Maharashtra
Specific schedules for bituminous (asphalt) work, earthwork for embankments, and structural steel for bridges. Included for natural minerals like sand, rubble, and metal
Focus on structure, analysis of rates, lead/lift, and index application – not memorizing 2015 rates. Focus on structure, analysis of rates, lead/lift, and
| Sr. No. | Description of Item | Unit | Rate (₹) | |---------|--------------------|------|-----------| | 1 | Earthwork in excavation in ordinary soil (all leads & lifts up to 50m) | cum | 135.00 | | 2 | Earthwork in hard murrum / soft rock | cum | 210.00 | | 3 | Filling available excavated earth (compacted) | cum | 85.00 | | 4 | Providing and laying cement concrete 1:4:8 (40 mm aggregate) | cum | 2,850 | | 5 | RCC 1:2:4 (20 mm aggregate) – excluding steel | cum | 4,200 | | 6 | Reinforcement steel (Fe 500) – cutting, bending, placing | MT | 48,000 | | 7 | Brick masonry in CM 1:6 (class 7.5 bricks) | cum | 3,200 | | 8 | 12 mm cement plaster 1:6 | sqm | 75.00 | | 9 | Whitewashing / color washing (two coats) | sqm | 18.00 | | 10 | Painting – enamel paint (two coats over primer) | sqm | 65.00 | | 11 | Flooring – ceramic tiles 300x300 mm (including 20 mm thick mortar) | sqm | 310.00 |
The document is not a monolithic slab rate. It is divided into of Maharashtra (including now-separated districts like Palghar, which was part of Thane in 2015). For each district, the rates vary based on:
Understanding the PWD Maharashtra District Schedule of Rates (DSR) 2015-16